iifc@infra-bd.com  +88 02 55013876-80
IPFF II Project Project Management DTCA DTCA
Latest News

Ongoing Projects

Sl. Project Name Sector Agreement Signing Date Client
1 Developing FSM PPP Guideline, FSM PPP Procurement Document and Providing Transaction Advisory Services for Jashore FSM PPP Project Water Supply & Sanitation 29 Jun 2020 SNV Netherlands Development Organization
2 Amendment and Translation into Bengali Version of the Railways Act 1890 (Act No. IX of 1890) of Bangladesh Railway Railway 5 Jul 2020 Bangladesh Railway (BR)
3 Condition Survey, Test and trial of 1 No. 60T Bollard Pull Tug for Payra Port Authority Ports 25 Jun 2020 Payra Port Authority (PPA)
4 Sub-soil Investigation, Data Collection, Preparation of Bid Document with Employer’s requirement for the construction of Bridge at Ferry Location at 17th km on Kachua-Betagi-Patuakhali-Lohalia-Kalaya Road (Z8052) under Bangladesh Bridge Authority (BBA). Road and Bridges 25 Jun 2020 Bangladesh Bridge Authority (BBA)
5 Supporting Bangladesh Economic Zone Authorities PPP Initiatives for Development of Economic Zones Economic Zone 14 Jun 2020 Bangladesh Economic Zones Authority (BEZA)
6 Consultancy Service for IEE, EIA, RAP, Route Survey and Preparation of ESIA Report of “Transmission Infrastructure Development Project for Southern Area of Chattogram Division and Bangabandhu Hi-Tech City at Kaliakoir Project” Power 4 Jun 2020 Bangladesh Power Development Board (PGCB)
7 Feasibility study and detail design for construction of broad gauge railway line from Gobra to Pirojpur and rail connection to Bagerhat Railway 4 Jun 2020 Bangladesh Railway (BR)
8 Feasibility Study for the Procurement of Required Numbers of Hovercrafts including the Repair Facilities and Infrastructures in order to facilitate Fast and Easy Transport System in the Inland and Coastal Areas Transport 7 Mar 2020 Bangladesh Inland Water Transport Corporation (BIWTC)
9 Feasibility Study and Conceptual Design of Proposed Bus Terminal and Depot Transport 5 Mar 2020 Dhaka Transport Coordination Authority (DTCA)
10 Conducting Performance Audit of Generation and Distribution Units of Power Sector Power 19 Feb 2020 Power Division, Ministry of Power, Energy and Mineral Resources
11 Provision of PPP Transaction Advisory Services for “Development of a Coal/Bulk Terminal of Payra Port on Public-Private Partnership Ports 13 Feb 2020 Payra Port Authority (PPA)
12 Competency Assessment for Share Offloading of B -R Powergen Ltd. Reforms 28 Jan 2020 B-R Powergen Limited
13 Legal Assistance in Rabnabad Channel Capital and Maintenance Dredging Ports 1 Sep 2019 Payra Port Authority (PPA)
14 Preparation of Bid Document for Development of Multi-Modal Container Terminal Cum off-Dock Near Chattogram Port Railway Yard Railway 1 Jan 2020 Container Company of Bangladesh Ltd. (CCBL)
15 Design & Procurement Documents of Commercial Building and Car Parking Shed at Payra Port, Patuakhali Ports 1 Jan 2019 Payra Port Authority (PPA)
16 Transaction advisory services for development of 13 textile mill sites of BTMC on PPP Textile 12 Nov 2019 Bangladesh Textile Mills Corporation (BTMC)
17 Feasibility Studies of 8 (Eight) Newly Proposed Hi-Tech Parks/Incubation Centers at Different Places of the Country Information & Technology (IT) 11 Nov 2019 Bangladesh Hi-Tech Park Authority (BHTPA)
18 Enhancing capacity of LGIs to address PPP contracts for FSM services Water Supply & Sanitation 30 Oct 2019 SNV Netherlands Development Organization
19 Land Acquisition Consultancy services for the Project “Construction of dual Gauge Double Lin between Joydebpur-Ishurdi Sections of Bangladesh Railway” Project Railway 17 Oct 2019 Bangladesh Railway (BR)
20 Design, Drawing and Supervision of the Chemical Warehouse Construction Project Design Supervision 18 Sep 2019 Bangladesh Steel Engineering Corporation (BSEC)
21 Feasibility study of Ramgarh as well as detail design of Ramgarh, Bhomra and Benapole land ports Ports 15 Sep 2019 Bangladesh Land Port Authority (BLPA)
22 Feasibility study of twelve economic zones Economic Zone 26 Jun 2019 Bangladesh Economic Zones Authority (BEZA)
23 Revision and updating of previous study report on bus route rationalization and company based operation of bus service in Dhaka Transport 29 Aug 2019 Dhaka Transport Coordination Authority (DTCA)
24 Formulation of draft revised DTCA Act. organogram, rules, regulation and guideline Reforms 29 Aug 2019 Dhaka Transport Coordination Authority (DTCA)
25 Feasibility stydy to undertake a project for operationalization the NSDA, building its capacity, strengthening the industry skill council Capacity Building 22 Aug 2019 National Skills Development Authority (NSDA)
26 Environmental Impact Assessment (EIA) Study of the Proposed Jamalpur Economic Zone at Jamalpur Sadar Upazila under Jamalpur District Economic Zone 29 Jul 2019 Bangladesh Economic Zones Authority (BEZA)
27 Engineering Design and Preparation of Construction Methodology & EPC Bid Document for construction of Gas Transmission Pipeline along the proposed Bangabandhu Sheikh Mujib Railway Bridge Gas 16 Apr 2019 Gas Transmission Company Ltd (GTCL)
28 Technical Advisory Services to Support PIU (Package No: IPFF II SIA) Multi-sector 12 Mar 2019 Misc.
29 Preparation of Drawing & Design of Belonia Land Port Ports 1 Jan 2019 Payra Port Authority (PPA)
30 Facilitating Type test of Transformer for GEMCO Multi-sector 4 Dec 2018 General Electric Manufacturing Company Limited (GEMCO)
31 Preparation of complete Feasibility Study Report, Tender Documents, Providing Assistance in Evaluating Tenders for Implementing the Ship Acquisition Projects/td> Ports 12 Nov 2018 Bangladesh Shipping Corporation (BSC)
32 Transaction Advisory Services for Construction of Khan Jahan Ali Airport Through PPP Civil Aviation 16 July 2018 Civil Aviation Authority of Bangladesh (CAAB)
33 Design, construction supervision & Resettlement plan for APs of the payra sea port Ports 28 Apr 2018 Payra Port Authority (PPA)
34 Construction Supervision and Related Services for Boats/Vessels Procured by Payra Port Authority Ports 23 May 2018 Payra Port Authority (PPA)

The site was last updated: 2020-6-28, 11:25:30